Timeline

Flight Day 1 - July 15

  • Launch
  • Payload Bay Door Opening
  • Ku-Band Antenna Deployment
  • Shuttle Robotic Arm Activation
  • Umbilical Well and Handheld External Tank Photo and TV Downlink

Flight Day 2 - July 16

  • Endeavour Thermal Protection System Survey with Shuttle Robotic Arm/Orbiter Boom Sensor System (OBSS)
  • Extravehicular Mobility Unit Checkout
  • Centerline Camera Installation
  • Orbiter Docking System Ring Extension
  • Orbital Maneuvering System Pod Survey
  • Rendezvous Tools Checkout

Flight Day 3 - July 17

  • Rendezvous with the International Space Station
  • Rendezvous Pitch Maneuver Photography of Endeavour's Thermal Protection System by the Expedition 20 Crew
  • Docking to Harmony/Pressurized Mating Adapter-2
  • Hatch Opening and Welcoming
  • Kopra and Wakata exchange Soyuz seatliners; Kopra joins Expedition 20, Wakata joins the STS-127 crew
  • U.S. spacesuit transfer from Endeavour to space station
  • Canadarm2 and Kibo robotic arm positioning for Spacewalk 1
  • Spacewalk 1 Procedure Review
  • Spacewalk 1 Campout by Wolf and Kopra

Flight Day 4 - July 18

  • Shuttle Robotic Arm Grapple and Unberth of Japanese Exposed Facility
  • Shuttle Robotic Arm Handoff of Japanese Exposed Facility to Canadarm2
  • Canadarm2 installation of Japanese Exposed Facility to Kibo
  • Spacewalk 1 by Wolf and Kopra (Japanese Exposed Facility Berthing, Port 3 Nadir Unpressurized Cargo Carrier Attach System (UCCASS) Deploy, Starboard 3 Zenith Outboard Payload Attachment System (PAS) Deploy)

Flight Day 5 - July 19

  • Focused Inspection of Endeavour's Thermal Protection System, if required
  • Shuttle Robotic Arm grapple of the Integrated Cargo Carrier-Vertical Light Deploy (ICC-VLD) and handoff to Canadarm2 for installation on the Payload Orbital Replacement Unit Accommodation (POA)
  • Spacewalk 2 Procedure Review
  • Spacewalk 2 Campout by Wolf and Marshburn

Flight Day 6 - July 20

  • Spacewalk 2 by Wolf and Marshburn (Transfer of critical station spare components from ICC-VLD to External Stowage Platform-3, installation of Japanese Experiment Facility forward camera)

Flight Day 7 - July 21

  • Shuttle Robotic Arm grapple, unberth and handoff of Japanese Logistics Module-Exposed Section to Canadarm2
  • Canadarm2 installation of Japanese Exposed Section on Japanese Exposed Facility
  • Canadarm2 removal of ICC-VLD from POA and Mobile Transporter move to different worksite
  • Spacewalk 3 Procedure Review
  • Spacewalk 3 Campout by Wolf and Cassidy

Flight Day 8 - July 22

  • Spacewalk 3 by Wolf and Cassidy (Replacement of four out of six batteries in the Port 6 truss integrated electronics assembly)

Flight Day 9 - July 23

  • Kibo robotic arm transfer of three Japanese science payloads (Monitor of All-sky X-ray Image (MAXI), Space Environment Data Acquisition equipment - Attached Payload, or SEDA-AP and Interorbit Communication System - Exposed Facility, or ICS-EF) from the Japanese Exposed Section to the Japanese Exposed Facility
  • Spacewalk 4 Procedure Review
  • Spacewalk 4 Campout by Cassidy and Marshburn

Flight Day 10 - July 24

  • Spacewalk 4 by Cassidy and Marshburn (Replacement of the final pair of batteries in the Port 6 truss integrated electronics assembly, installation of the Japanese Experiment Facility aft camera)
  • Canadarm2 grapple and handoff of the ICC-VLD to the Shuttle robotic arm for berthing in Endeavour's payload bay

Flight Day 11 - July 25

  • Crew Off Duty Day

Flight Day 12 - July 26

  • Canadarm2 grapple and handoff of Japanese Exposed Section to Shuttle robotic arm for berthing in Endeavour's payload bay
  • Transfer of equipment and payloads from Endeavour to space station
  • Joint Crew News Conference at 2:28 p.m. EDT
  • Spacewalk 5 Procedure Review
  • Spacewalk 5 Campout by Cassidy and Marshburn

Flight Day 13 - July 27

  • Spacewalk 5 by Cassidy and Marshburn (Zenith 1 Patch Panel reconfiguration, Starboard 3 nadir outboard and inboard PAS deployment, Starboard 3 wireless camera equipment installation, Dextre manipulator insulation removal)

Flight Day 14 - July 28

  • Final farewells and hatch closure at 10:23 a.m. EDT
  • Endeavour undocking from ISS at 1:26 p.m. EDT
  • Flyaround of ISS and final separation as of 1:51 p.m. EDT

Flight Day 15 - July 29

  • Canadarm2 unberth of OBSS and handoff to Shuttle robotic arm
  • Late inspection of Endeavour's thermal protection system with the OBSS

Flight Day 16 - July 30

  • Flight Control System checkout
  • Reaction Control System hot-fire test
  • DRAGONSAT and ANDE-2 payload deployments
  • Crew deorbit briefing
  • Ku-band antenna stowage
  • Recumbent seat setup for Wakata

Flight Day 17 - July 31

  • Deorbit preparations
  • Payload bay door closing
  • Deorbit burn
  • KSC landing at 10:48 a.m. EDT
  • NASA post-landing news conference at L+2 hours